← emsproject.org

IPv6-only walk

A site can have IPv6 itself and still load its checkout, captcha, chat or fonts from hosts that only have IPv4. This walk loads emsproject.org's home page and checks every outside host it pulls from.

 Takes a few seconds. We load the home page once and look up every host it names.

What this does and doesn't show

How we measure